Peru faces second claim over transmission line

Peru faces a second ICSID claim over a tender to build an electrical transmission line between Cotaruse and Machu Picchu, filed by the Spanish parent companies of an existing claimant at the centre.

Unlock unlimited access to all Latin Lawyer content